Produits d'Eumetsat : annonces et informations

#170 - Utilisation opérationnelle des instruments GOME-2 à bord de Metop-A et Metop-B.


EUMETSAT annonce qu'à partir du 15 juillet 2013 débutera une phase opérationnelle d'utilisation en tandem des instruments GOME-2 à bord de Metop-A et Metop-B.

Les détails sont indiqués ci-dessous :

1) GOME-2 on Metop-A: Switch of nominal swath width to 960 km. This will reduce the ground pixel sizes for measurements at nominal integration times of 0.1875 to 40 by 40 km. Polarisation device measurements (PMD) ground pixel sizes will be reduced to 40 by 5 km.
2) GOME-2 on Metop-A: The monthly narrow swath scanning period will be replaced with one day of scanning using a 320 km swath.
3) GOME-2 on Metop-B: Nominal scanning will be unaffected (1920 km swath).
4) GOME-2 on Metop-B: The monthly narrow scanning sequence will be removed from the 29 days repeat cycle.
For details on the 29 days on-board timeline sequence for both instruments, please refer to:
http://oiswww.eumetsat.org/epsreports/html/tl.php?sat=M01
http://oiswww.eumetsat.org/epsreports/html/tl.php?sat=M02

Voir les autres informations EUMETCast